- Completed
- 2020
- Location
- Vietnam
- Contract type
- EPC contractor
- Area
- 30,000 m²
Project overview
GPPD Energy Company Limited Factory is an industrial project in Dong Nai, delivered by World Steel Group in 2020. Scope: EPC Contractor.
The project was delivered for GPPD Energy Company Limited.
Published size: floor area of 30,000 m².
World Steel Group’s role
As EPC contractor, World Steel Group was the single point of responsibility from design and procurement to construction, commissioning and handover, accountable for cost, schedule and quality.
Members were produced in Vietnam and delivered straight to site, which keeps erection on schedule and makes site adjustments quick to handle.
Scope of work
- EPC Contractor
What industrial projects require
Industrial buildings need long spans, room to expand later and short construction times, the strengths of pre-engineered steel buildings.
Project photos 0 hình ảnh đã tải lên
Request a Quotation (RFQ)
Submit Project Specifications & Engineering Drawings (Unlimited File Size)
Attach CAD/BIM models (.ifc, .rvt, .glb, .dwg, .pdf, .zip) of any size. Large files are automatically sliced into 2 MB chunks for reliable upload.