HAI SON INDUSTRIAL PARK · 20,000 M² 40,000 TONS / YEAR CAPACITY IAS AC472 · ISO 3834-2 · EN 1090 EXC3

Heavy Structural Steel Manufacturing & 12-Step QC Production Process

Located at Lot Q9–Q10, Hai Son Industrial Park, our 20,000 m² CNC manufacturing complex integrates high-precision plasma/laser cutting, automated H-beam assembly, SAW welding, and Sa 2.5 shot blasting.

Automated CNC Fabrication Lines

LINE 01 · CUTTING & DRILLING

CNC Fiber Laser & Multi-Torch Plasma Cutting

Direct Tekla DSTV/NC1 import for high-thickness steel plates (up to 80mm) and 3-spindle CNC H-beam drilling lines with ±0.5mm hole tolerance.

LINE 02 · BUILT-UP H-BEAMS

Hydraulic H-Beam Assembly & Twin-Wire SAW

Automated web-to-flange tacking, gantry Submerged Arc Welding (SAW) with Lincoln Electric power sources, and hydraulic flange straightening.

LINE 03 · COLD ROLL FORMING

Automatic Z/C Purlin & Standing Seam Lines

Continuous CNC roll-forming lines with automated pre-punching and ink-jet part marking for high-tensile G450/Z275 purlins and Kliplok/Seamlock roofing.

LINE 04 · SURFACE PREPARATION

8-Turbine Roller Conveyor Shot Blasting

Automated steel grit/shot blasting chamber achieving ISO 8501-1 Sa 2.5 cleanliness and 50–75 μm anchor profile prior to primer application.

LINE 05 · PROTECTIVE COATING

Airless Spray Booths & Hot-Dip Galvanizing

Climate-controlled painting booths for Jotun, International, and Sherwin-Williams epoxy/PU/intumescent systems, plus ASTM A123 HDG up to 610 g/m².

LINE 06 · NDT & METROLOGY

In-House NDT & Trial Assembly Yard

Ultrasonic (UT), Magnetic Particle (MT), Penetrant (PT), PosiTector DFT gauges, pull-off adhesion testers, and full trial fit-up yard.

12-Stage Controlled Manufacturing Workflow

01

Raw Material & MTC Inspection

Verify EN 10204 3.1 Mill Test Certificates, heat numbers, chemical composition, and tensile yield strength.

02

CNC Cutting & Nesting

Automated CNC plasma, oxy-fuel, and fiber laser cutting directly from Tekla Structures NC1 files.

03

H-Beam Fit-Up & Tack Welding

Hydraulic assembly of web and flanges with strict camber, sweep, and squareness verification.

04

Submerged Arc Welding (SAW)

Full-penetration and fillet SAW welding by AWS D1.1 / ISO 9606 qualified welders.

05

Mechanical Flange Straightening

Eliminate thermal welding distortion to meet AISC 303 and MBMA dimensional tolerances.

06

Connection Plate Fit-Up & GMAW

Fit-up and welding of end-plates, stiffeners, gussets, and crane brackets using calibrated jigs.

07

Non-Destructive Testing (NDT)

100% Visual Inspection (VT) plus Ultrasonic (UT) and Magnetic Particle (MT) weld testing per AWS D1.1.

08

Shot Blasting (ISO 8501-1 Sa 2.5)

8-wheel turbine abrasive blasting to remove mill scale and establish surface roughness profile.

09

Primer & Intermediate Coating

High-pressure airless application of Zinc-Rich Epoxy / Alkyd primer with wet & dry film thickness checks.

10

Topcoat / Fireproofing / HDG

Polyurethane topcoat, intumescent fire-rated coating, or ASTM A123 Hot-Dip Galvanizing.

11

Final QC, Hard-Stamping & Barcoding

Piece-mark verification, QR barcode tagging, and complete MDR (Manufacturer Data Report) compilation.

12

Steel Rack Packing & Container Loading

Loading onto custom telescopic steel skids inside 40’ HQ/OT containers with fumigation & lashings.

Request a Quotation (RFQ)

Submit Project Specifications & Engineering Drawings (Unlimited File Size)

Attach CAD/BIM models (.ifc, .rvt, .glb, .dwg, .pdf, .zip) of any size. Large files are automatically sliced into 2 MB chunks for reliable upload.

01. Project Scope
02. Technical Specs
03. Drawings (Unlimited MB)
04. Contact & Submit

Drag & Drop IFC, RVT, GLB, DWG, PDF, or ZIP Files Here (No MB Limit)